MLOps, LLMOps and AI Infrastructure

GPU Infrastructure and Cost Optimisation

Finding out where GPU spend actually goes before changing anything — which is usually idle capacity, oversized instances and jobs that were never sized against the hardware they run on.

4 to 8 weeks
Typical engagement
Fixed fee
Commercial model
Measured
Before changed

GPU bills grow for boring reasons. An instance provisioned for a training run in February is still up in September. An endpoint sized for a launch peak that never arrived. A team that picked the largest available card because the choice was not worth arguing about. Almost none of it is exotic, and almost all of it is invisible without measurement.

In one paragraph

GPU infrastructure and cost optimisation is the work of measuring how accelerated compute is actually used, right-sizing it to real demand, improving scheduling and utilisation, and selecting purchasing models — on demand, spot, committed or reserved — that match the workload's tolerance for interruption.

Where the money usually goes

CauseTypical findingRemedy
Idle provisioned capacityInstances running at low utilisation around the clockScheduling, autoscaling, scale-to-zero
Oversized instancesA large card serving a model that fits comfortably on a smaller oneRight-sizing measured against real load
Poor batchingRequests served one at a time on hardware built for parallelismDynamic batching in the serving layer
Full precision by defaultServing at a precision the accuracy target does not requireQuantisation, validated for accuracy
On-demand for interruptible workTraining and batch paying peak ratesSpot with checkpointing; committed use for steady load
Development environmentsNotebook instances left running for weeksIdle shutdown and clear ownership
Forgotten experimentsResources with no owner and no purposeTagging and an ownership review

The distribution varies, but idle capacity is almost always the largest single line, and it is also the least technically interesting to fix. That is why measurement comes first: the optimisations people find exciting are rarely the ones that recover the most money.

How we approach it

Profile before proposing

Utilisation, memory use, batch behaviour and idle time per workload, joined to billing so every line has an owner and a purpose. A surprising share of an engagement is resolved by finding resources nobody can account for.

Right-size against measurement

Which accelerator a workload actually needs, determined by profiling rather than by the default that was chosen once and never revisited. Memory capacity is frequently the real constraint, and a smaller card with adequate memory is often both faster in practice and materially cheaper.

Separate training from serving

They have opposite characteristics. Training is bursty, interruptible and suits spot pricing with checkpointing; serving is continuous and latency-sensitive and suits committed capacity. Treating them as one pool overpays for both.

Improve utilisation before buying differently

Batching, queueing, model concurrency on a single card and scale-to-zero for intermittent endpoints. Utilisation improvements compound with every other saving, whereas purchasing changes alone leave the underlying waste in place.

Match the purchasing model to interruption tolerance

Spot for checkpointed training, committed use or reserved capacity for steady serving, on demand for genuinely variable load. The mistake in both directions is common: paying on demand for predictable work, or committing to capacity for a workload that may not exist in six months.

Ask whether the GPU is needed at all

Some inference workloads run acceptably on CPU once the model is optimised or distilled, and a smaller model that meets the quality bar removes the accelerator entirely. This is the largest available saving and the one least often examined.

Worth knowing

Measure, change, verify — in that order

Every optimisation is validated for accuracy and latency before it stands. A cost reduction that quietly degrades quality is not a saving, it is a deferred incident, and quantisation and right-sizing are both capable of doing it if applied without measurement.

What we hand over

The savings matter less than the ability to keep them. Costs regrow after an optimisation exercise unless attribution and ownership persist:

  • Cost attribution by team, workload and model, so spend has an owner rather than appearing as one infrastructure line.
  • Utilisation dashboards that make idle capacity visible to the people who provisioned it.
  • Budget alerting on unexpected growth, rather than a monthly discovery.
  • Provisioning guidance so the next workload starts right-sized instead of defaulting to the largest option.
Process

How the engagement runs

Utilisation is measured and attributed before any change is proposed.

Weeks 1 to 2

Profiling

Utilisation, memory, batching and idle time measured per workload and joined to billing data.

Week 3

Opportunity report

Savings ranked by size and by risk, with the accuracy or latency implication of each stated.

Weeks 4 to 6

Implementation

Right-sizing, scheduling, batching, precision and purchasing changes applied and verified.

Week 7

Attribution and alerting

Tagging, cost dashboards, budget alerts and ownership established.

Week 8

Handover

Provisioning guidance and a review cadence so savings persist rather than regrow.

Deliverables

What you receive

A measured reduction, verified for accuracy and latency, plus the attribution that keeps it from regrowing.

01

Utilisation and cost report

Per workload, joined to billing, with unowned and idle resources identified.

02

Opportunity analysis

Savings ranked by size and risk, each with its accuracy or latency implication stated.

03

Implemented optimisations

Right-sizing, scheduling, batching and purchasing changes, each verified before it stands.

04

Cost attribution

Tagging and dashboards assigning spend to team, workload and model.

05

Budget alerting

Alerts on unexpected growth, routed to the owners who can act.

06

Provisioning guidance

How the next workload is sized, so the problem does not rebuild itself.

Fit check

Is this the right engagement?

Worth being direct. GPU Infrastructure and Cost Optimisation is the wrong spend in some situations, and those are listed rather than buried.

Good fit if

  • GPU or accelerator spend has grown faster than the work it supports.
  • Nobody can attribute infrastructure cost to a team or a model.
  • Instances are suspected of running idle and nobody is sure which.
  • Training and serving share one pool and both are expensive.
  • A decision on committed or reserved capacity is imminent and unsupported by data.

Choose something else if

  • Spend is small enough that the engagement costs more than it recovers.
  • The real problem is per-request latency. See inference optimisation.
  • The cost is language model API usage rather than infrastructure. See LLMOps for attribution first.
  • No access to billing or workloads can be granted, which makes measurement impossible.
Questions

Frequently asked questions

Marked up with FAQPage schema so these answers can surface directly in search results and inside AI assistant responses.

Where does GPU spend usually leak?

Idle provisioned capacity first, then oversized instances, then poor batching, then paying on-demand rates for interruptible training. The proportions differ but idle capacity is nearly always the largest line, which is why profiling precedes proposals — the interesting optimisations are rarely the valuable ones.

Can we use spot instances for training?

Usually yes, and it is one of the larger straightforward savings, provided training checkpoints frequently enough that an interruption costs minutes rather than a run. Implementing reliable checkpointing is part of the work. Spot is not appropriate for latency-sensitive serving.

Will optimisation hurt model accuracy?

Not if it is verified, which is why every change is measured against accuracy and latency before it stands. Quantisation and right-sizing can both degrade quality if applied blindly; applied with measurement, the accuracy difference is usually negligible and occasionally zero.

Do we need GPUs at all?

Sometimes not, and it is worth checking properly. Optimised or distilled models often serve acceptably on CPU, and a smaller model meeting the quality bar removes the accelerator entirely. It is the largest available saving and the one most rarely examined, so we test it rather than assuming the GPU is required.

How do we stop costs growing back?

With attribution and ownership. Cost tagged by team, workload and model, utilisation dashboards visible to whoever provisioned the resource, budget alerts on growth, and guidance so the next workload starts right-sized. Without those, an optimisation exercise is a one-off dip in a rising line.

Is this the right engagement?

Tell us what you are trying to build. If a different service fits better, or if you do not need us at all, we will say so.