EU AI Act transparency duties apply now; high-risk duties from December 2027. Check your exposure
Insights About us Careers
Contact us
Managed AI Services and Talent

AI Project Rescue and Recovery

An independent, fast assessment of a project that has stalled or is failing — what is recoverable, what should be written off, and whether continuing is the right decision at all.

2 to 4 weeks
Assessment
Fixed fee
Commercial model
May recommend
Stopping

By the time someone commissions a rescue, there is usually a sponsor who has defended the project publicly, a team that knows what went wrong and has stopped saying so, and a deadline that passed twice. The technical assessment is the easy half.

In one paragraph

AI project rescue is an independent assessment of a stalled, over-running or failing AI project: establishing what actually went wrong, what is technically salvageable, what recovery would cost, and whether recovery is the right decision — followed, where appropriate, by delivery of the recovery.

Why AI projects fail, in rough order of frequency

CauseHow it presentsRecoverable?
The data was never adequatePerpetual 'nearly ready' modelsSometimes — fix the data first
Framing was wrongAccurate model nobody can act onYes, by re-framing — but it is a restart
LeakageExcellent tests, useless productionYes, once identified
No baseline was setNobody can say if it is any goodYes, and it may end the project
Evaluation never designedEndless disagreement about qualityYes, and it is quick
Built with no path to productionA notebook that cannot shipUsually a rebuild of the wrapper
No owner or sponsor engagementDrifting, nobody decidingOnly if that is fixed first
The problem does not need AIComplexity with no benefit over rulesRecover by simplifying
Worth knowing

Sometimes the honest recommendation is to stop

A meaningful share of these assessments conclude that the project should be cancelled, or radically narrowed, and that continuing would cost more than the outcome is worth. That is an uncomfortable report to deliver and it is the most valuable one we produce, because the alternative is another year of the same.

How the assessment runs

Talk to the team first, and protect what they say

The people doing the work almost always know what went wrong and have usually stopped saying it out loud. Confidential conversations early produce a truer picture in two days than a fortnight of document review, and we protect the sources.

Check the data before the code

Most AI project failures are data failures wearing a modelling costume. Whether the data can support the question being asked is established first, because if the answer is no, nothing downstream matters.

Look for leakage and for the missing baseline

The two defects that most often explain a project that tested beautifully and failed in production, or that has run for a year with nobody able to say whether it works. Both are quick to check and frequently decisive.

Separate the technical from the organisational

Some projects fail on engineering and many fail on ownership, unclear decision rights or a sponsor who cannot say no. Recovering the technology without fixing that produces a better-built failure, so we report both even though only one is comfortable to hear.

Cost the options properly

Recover, restart narrower, replace with something bought, or stop — each with an honest estimate and the risk attached. The estimate for continuing is frequently the first credible one the sponsor has been given.

Deliver the report to the sponsor and the team together

Findings delivered privately to the sponsor and softened for the team, or vice versa, do not survive contact with the next steering meeting. One report, one conversation.

If recovery is the right call

  1. Fix the foundation first — data, framing, evaluation and baseline — before touching the model, because rebuilding on the original fault repeats it.
  2. Narrow the scope to the smallest version that would deliver value, and prove that before widening.
  3. Establish measurement so progress is visible and the next stall is caught early.
  4. Work with the existing team where possible. They have the domain knowledge, and replacing them wholesale discards it and demoralises everyone who remains.
  5. Set a review point with a stop criterion, so recovery cannot itself become the next drifting project.

We take the recovery work where it makes sense and we will hand it to your own team where that is better. The assessment is priced and delivered independently of whether recovery follows, so its conclusions are not shaped by wanting the next engagement.

Process

How the engagement runs

The assessment is priced independently of the recovery, so the conclusion is not for sale.

Days 1 to 3

Team conversations

Confidential discussions with the people doing the work, whose account is usually accurate.

Days 4 to 8

Data and technical review

Whether the data supports the question; leakage, baseline, evaluation and production path checked.

Days 9 to 12

Organisational review

Ownership, decision rights and sponsor engagement assessed alongside the technical picture.

Days 13 to 16

Options and costing

Recover, restart narrower, replace or stop — each estimated honestly with its risks.

Days 17 to 20

Report

Delivered to sponsor and team together, with the recommendation stated plainly.

Deliverables

What you receive

A straight answer about a project nobody has been able to give a straight answer about.

01

Root cause findings

Technical and organisational, with team accounts protected.

02

Data adequacy assessment

Whether the data can support the question being asked.

03

Technical review

Leakage, baseline, evaluation design and path to production.

04

Salvage assessment

What is reusable, what should be discarded, and why.

05

Costed options

Recover, restart narrower, replace or stop, each with an honest estimate.

06

Recommendation

Stated plainly, including when the recommendation is to stop.

Fit check

Is this the right engagement?

Worth being direct. AI Project Rescue and Recovery is the wrong spend in some situations, and those are listed rather than buried.

Good fit if

  • A project has missed its date more than once with no clear reason.
  • A model tests well and fails in production.
  • Nobody can say whether the project is on track.
  • A sponsor needs an independent read before committing further budget.
  • The team has lost confidence and nobody has asked them why.

Choose something else if

  • You want an independent report that endorses continuing.
  • The team cannot be spoken to candidly.
  • The project is fine and needs more capacity. See staff augmentation.
  • A decision to cancel has been made and you want it justified afterwards.
Questions

Frequently asked questions

Marked up with FAQPage schema so these answers can surface directly in search results and inside AI assistant responses.

How quickly can you assess a failing project?

Two to four weeks for a substantive assessment, and the shape of the answer is usually clear within the first week. Talking to the team early is what makes it fast — they generally know what went wrong and have often stopped saying so, and confidential conversations produce a truer picture than document review.

What is the most common cause of failure?

Data that was never adequate for the question, followed by wrong framing — an accurate model producing predictions nobody can act on. After those, leakage and the absence of a baseline. The technical causes are usually easier to fix than the organisational ones underneath them.

Will you tell us to cancel?

If that is the honest answer, yes. A meaningful share of these assessments conclude the project should be stopped or radically narrowed. The assessment is priced independently of any recovery work precisely so that conclusion is available to us — a report shaped by wanting the next engagement is worth nothing.

Do we have to replace our team?

Usually not, and we would advise against it. The existing team holds the domain knowledge, and wholesale replacement discards it while demoralising whoever remains. Most recoveries work best with the same people and a corrected foundation, sometimes with additional skills alongside them.

What if the problem is organisational rather than technical?

Then that goes in the report, because recovering the technology without fixing ownership, decision rights or sponsor engagement produces a better-built failure. It is the less comfortable half of the findings and frequently the more important one, and we deliver it to the sponsor and the team in the same room.

Is this the right engagement?

Tell us what you are trying to build. If a different service fits better, or if you do not need us at all, we will say so.